Skip to content
UT Studio

Roadmap

What is built and what is next

Phases with exit conditions rather than dates. A date on a roadmap becomes a promise; a phase boundary is a commitment about sequence.

Phases

  1. ShippedPhase 1

    Platform foundation

    Monorepo, shared packages, application shell, CI. The workspace every later phase plugs into.

    • Infrastructure
  2. ShippedPhase 2

    Core infrastructure

    Domain schema across nine bounded contexts, repositories, the licence and download engines, storage and payment abstractions.

    • Domain
    • Engineering
  3. ShippedPhase 2.5

    Design system

    Tokens, three themes, motion language, component inventory and the accessibility contract every surface is held to.

    • Design
  4. In progressPhase 3

    Marketing platform

    The public website: navigation, sections, SEO foundation and the content layer every page reads from.

    • Marketing
    • SEO
  5. PlannedPhase 4

    Marketplace

    Catalogue, product pages, checkout, licence issuance and the first real download. The phase that produces revenue.

    • Commerce
  6. PlannedPhase 5

    Customer dashboard

    Owned products, versions, licence keys, download history, invoices and team seats.

    • Product
  7. PlannedPhase 6

    Admin

    Release publishing, licence administration, media library and the operational surfaces for diagnosing failures.

    • Internal
  8. PlannedPhase 7

    Documentation and search

    Versioned product documentation, the changelog pipeline, and search across everything.

    • Content
  9. ExploringBeyond launch

    Semantic search and AI

    Hybrid retrieval over documentation. Built only once retrieval quality can be measured — not before.

    • AI